Abstract
The wide deployment of wireless devices, with their low installed
cost (compared to wired devices), will significantly improve the
productivity and safety of industrial plants, while simultaneously
increasing the efficiency and safety of the plant's workers, by
extending and making more timely the information set available about
plant operations. The new Routing Protocol for Low Power and Lossy
Networks (RPL) defines a Distance Vector protocol that is designed
for such networks. The aim of this document is to analyze the
applicability of that routing protocol in industrial LLNs of field
devices.
Status of this Memo
This Internet-Draft is submitted in full conformance with the
provisions of BCP 78 and BCP 79.
Internet-Drafts are working documents of the Internet Engineering
Task Force (IETF). Note that other groups may also distribute
working documents as Internet-Drafts. The list of current Internet-
Drafts is at http://datatracker.ietf.org/drafts/current/.
Internet-Drafts are draft documents valid for a maximum of six months
and may be updated, replaced, or obsoleted by other documents at any
time. It is inappropriate to use Internet-Drafts as reference
material or to cite them other than as "work in progress."
This Internet-Draft will expire on April 3, 2012.
Copyright Notice
Copyright (c) 2011 IETF Trust and the persons identified as the
document authors. All rights reserved.
This document is subject to BCP 78 and the IETF Trust's Legal
Phinney, et al. Expires April 3, 2012 [Page 1]
Internet-Draft RPL-industrial-applicability-statement October 2011
Provisions Relating to IETF Documents
(http://trustee.ietf.org/license-info) in effect on the date of
publication of this document. Please review these documents
carefully, as they describe your rights and restrictions with respect
to this document. Code Components extracted from this document must
include Simplified BSD License text as described in Section 4.e of
the Trust Legal Provisions and are provided without warranty as
described in the Simplified BSD License.
Phinney, et al. Expires April 3, 2012 [Page 2]
Internet-Draft RPL-industrial-applicability-statement October 2011
Table of Contents
1. Introduction . . . . . . . . . . . . . . . . . . . . . . . . . 4
2. Terminology . . . . . . . . . . . . . . . . . . . . . . . . . 6
3. Overview . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
3.1. Deployment scenarii . . . . . . . . . . . . . . . . . . . 7
3.2. Applications and Traffic classes . . . . . . . . . . . . . 9
3.3. RPL applicability matrix . . . . . . . . . . . . . . . . . 10
4. Characterization of communication flows in IACS wireless
networks . . . . . . . . . . . . . . . . . . . . . . . . . . . 11
4.1. General . . . . . . . . . . . . . . . . . . . . . . . . . 11
4.2. Source-sink (SS) communication paradigm . . . . . . . . . 13
4.3. Publish-subscribe (PS, or pub/sub) communication
paradigm . . . . . . . . . . . . . . . . . . . . . . . . . 13
4.4. Peer-to-peer (P2P) communication paradigm . . . . . . . . 15
4.5. Peer-to-multipeer (P2MP) communication paradigm . . . . . 16
4.6. Additional considerations: Duocast and N-cast . . . . . . 17
4.7. RPL applicability per communication paradigm . . . . . . . 18
5. RPL profile . . . . . . . . . . . . . . . . . . . . . . . . . 21
5.1. Use for process control . . . . . . . . . . . . . . . . . 21
5.2. RPL features . . . . . . . . . . . . . . . . . . . . . . . 21
5.2.1. Storing vs. non-storing mode . . . . . . . . . . . . . 21
5.2.2. DAO policy . . . . . . . . . . . . . . . . . . . . . . 21
5.2.3. Path metrics . . . . . . . . . . . . . . . . . . . . . 22
5.2.4. Objective functions . . . . . . . . . . . . . . . . . 22
5.2.5. DODAG repair . . . . . . . . . . . . . . . . . . . . . 22
5.2.6. Security . . . . . . . . . . . . . . . . . . . . . . . 22
5.3. RPL options . . . . . . . . . . . . . . . . . . . . . . . 22
5.4. Recommended configuration defaults and ranges . . . . . . 22
5.4.1. Trickle parameters . . . . . . . . . . . . . . . . . . 22
5.4.2. Other parameters . . . . . . . . . . . . . . . . . . . 23
5.4.3. Additional configuration recommendations . . . . . . . 23
6. Other related protocols . . . . . . . . . . . . . . . . . . . 24
7. Manageability . . . . . . . . . . . . . . . . . . . . . . . . 25
8. IANA considerations . . . . . . . . . . . . . . . . . . . . . 26
9. Security considerations . . . . . . . . . . . . . . . . . . . 27
10. Acknowledgements . . . . . . . . . . . . . . . . . . . . . . . 28
11. References . . . . . . . . . . . . . . . . . . . . . . . . . . 29
11.1. Normative References . . . . . . . . . . . . . . . . . . . 29
11.2. Informative References . . . . . . . . . . . . . . . . . . 29
11.3. External Informative References . . . . . . . . . . . . . 30
Authors' Addresses . . . . . . . . . . . . . . . . . . . . . . . . 31
Phinney, et al. Expires April 3, 2012 [Page 3]
Internet-Draft RPL-industrial-applicability-statement October 2011
1. Introduction
Information Technology (IT) is already, and increasingly will be
applied to industrial Automation and Control System (IACS) technology
in application areas where those IT technologies can be constrained
sufficiently by Service Level Agreements (SLA) or other modest change
that they are able to meet the operational needs of IACS. When that
happens, the IACS benefits from the large intellectual, experiential
and training investment that has already occurred in those IT
precursors. One can conclude that future reuse of additional IT
protocols for IACS will continue to occur due to the significant
intellectual, experiential and training economies which result from
that reuse.
Following that logic, many vendors are already extending or replacing
their local field-bus technology with Ethernet and IP-based
solutions. Examples of this evolution include CIP EtherNet/IP,
Modbus/TCP, Foundation Fieldbus HSE, PROFInet and Invensys/Foxboro
FOXnet. At the same time, wireless, low power field devices are
being introduced that facilitate a significant increase in the amount
of information which industrial users can collect and the number of
control points that can be remotely managed.
IPv6 appears as a core technology at the conjunction of both trends,
as illustrated by the current [ISA100.11a] industrial Wireless Sensor
Networking (WSN) specification, where layers 1-4 technologies
developed for end uses other than IACS - IEEE 802.15.4 PHY and MAC,
6LoWPAN and IPv6, and UDP - are adapted to IACS use. But due to the
lack of open standards for routing in Low power and Lossy Networks
(LLN), even ISA100.11a leaves the routing operation to proprietary
methods.
The IETF ROLL Working Group has defined application-specific routing
requirements for a LLN routing protocol, specified in:
Routing Requirements for Urban LLNs [RFC5548],
Industrial Routing Requirements in LLNs [RFC5673],
Home Automation Routing Requirements in LLNs [RFC5826], and
Building Automation Routing Requirements in LLNs [RFC5867].
The Routing Protocol for Low Power and Lossy Networks (RPL)
[I-D.ietf-roll-rpl] specification and its point to point extension/
optimization [I-D.ietf-roll-p2p-rpl] define a generic Distance Vector
protocol that is adapted to a variety of Low Power and Lossy Networks
(LLN) types by the application of specific Objective Functions (OFs).
Phinney, et al. Expires April 3, 2012 [Page 4]
Internet-Draft RPL-industrial-applicability-statement October 2011
RPL forms Destination Oriented Directed Acyclic Graphs (DODAGs)
within instances of the protocol, each instance being associated with
an Objective Function to form a routing topology.
A field device that belongs to an instance uses the OF to determine
which DODAG and which Version of that DODAG the device should join.
The device also uses the OF to select a number of routers within the
DODAG current and subsequent Versions to serve as parents or as
feasible successors. A new Version of the DODAG is periodically
reconstructed to enable a global reoptimization of the graph.
A RPL OF states the outcome of the process used by a RPL node to
select and optimize routes within a RPL Instance based on the
information objects available. The separation of OFs from the core
protocol specification allows RPL to be adapted to meet the different
optimization criteria required by the wide range of industrial
classes of traffic and applications.
This document provides information on how RPL can accommodate the
industrial requirements for LLNs, in particular as specified in
[RFC5673].
Phinney, et al. Expires April 3, 2012 [Page 5]
Internet-Draft RPL-industrial-applicability-statement October 2011
2. Terminology
The key words "MUST", "MUST NOT", "REQUIRED", "SHALL", "SHALL NOT",
"SHOULD", "SHOULD NOT", "RECOMMENDED", "NOT RECOMMENDED", "MAY", and
"OPTIONAL" in this document are to be interpreted as described in RFC
2119 [RFC2119].
Additionally, this document uses terminology from
[I-D.ietf-roll-terminology], and uses usual terminology from the
Process Control and Factory Automation industries, some of which is
recapitulated below:
FEC: Forward error correction
IACS: Industrial automation and control systems
RAND: reasonable and non-discriminatory (relative to licensing of
patents)
Phinney, et al. Expires April 3, 2012 [Page 6]
Internet-Draft RPL-industrial-applicability-statement October 2011
3. Overview
3.1. Deployment scenarii
[RFC5673] describes in detail the routing requirements for industrial
LLNs. This RFC provides information on the varying deployment
scenarios for such LLNs and how RPL assists in meeting those
requirements.
Large industrial plants, or major operating areas within such plants,
repeatedly go through four major phases, each of which typically
lasts from months to years:
P1: Construction or major modification phase
P2: Planned startup phase
P3: Normal operation phase
P4: Planned shutdown phase
followed eventually by an (at least theoretical)
P5: Plant decommissioning phase.
It is also likely, after a major catastrophe at a plant, to have a
P6: Post-emergency recovery and repair phase.
The deployment scenarios for wireless LLN devices may be different in
each of these phases. In particular, during the Construction or
major modification phase (P1), LLN devices may be installed months
before the intended LLN can become usefully operational (because
needed routers and infrastructure devices are not yet installed or
active), and there are likely to be many personnel in whom the plant
owner/operator has only limited trust, such as subcontractors and
others in the plant area who have undergone only a cursory background
investigation (if any at all). In general, during this phase, plant
instrumentation is not yet operational, so could be removed and
replaced by a Trojaned device without much likelihood of physical
detection of the substitution. Thus physical security of LLN devices
is generally a more significant risk factor during this phase than
once the plant is operational, where simple replacement of device
electronics is detectable.
Extra LLN devices and even extra LLN subnets may be employed during
Planned startup (P2) and Planned shutdown (P4) phases, in support of
the task of transitioning the plant or plant area between operational
Phinney, et al. Expires April 3, 2012 [Page 7]
Internet-Draft RPL-industrial-applicability-statement October 2011
and shutdown states. The extra devices typically provide extra
monitoring as the plant transitions infrequent activity states. (In
many continuous process plants, up to 2x extra staff are employed at
monitoring and control workstations during these two phases,
precisely because the plant is undergoing extraordinary behavior as
it transitions to or from its steady-state operational condition.)
Similar transient devices and subnets may be used during an
unscheduled Post-emergency recovery and repair phase (P6) of
operation, but in that case the extra devices usually are routers
substituting for plant LLN devices that have been damaged by the
incident (such as a fire, explosion, flood, tornado or hurricane)
that induced the emergency.
The Planned startup (P2) and Planned shutdown (P4) phases are similar
in many respects, but the LLN environment of the two can be quite
different, since the Planned shutdown phase can assume that the
stable LLN environment used for Normal operation (P3) is functional
during shutdown, whereas that stable environment usually is still
being established during startup.
The Post-emergency recovery and repair phase (P6) typically operates
in an LLN environment that is somewhere between that of the Planned
startup (P2) and Normal operation (P3) phases, but with an
indeterminate number of temporary routers placed to facilitate
communication across and around the area affected by the catastrophe.
Smaller industrial plants and sites may go through similar phases,
but often commingle the phases because, in those smaller plants, the
phases require less planning and structuring of personnel
responsibilities and thus permit less formalization and partitioning
of the operating scenarios. For example, it is much simpler, and
usually requires much less planning, to bring new equipment on a skid
into a plant, using a forklift, than to lay temporary railroad track
or employ an extended-axle heavy haul tractor-trailer to deliver a
multi-ton process vessel, and temporarily deploy and use very large
heavy-lift cranes to install it. In the former cases, nearby
equipment usually can continue normal operation while the
installation proceeds; in the latter case that is almost always
impossible, due to safety and other concerns.
The domain of applicability for the RPL protocol may include all
phases but the Normal Operation phase, where the bandwidth allocation
and the routes are usually optimized by an external Path Computing
Engine (PCE), e.g. an ISA100.11a System Manager.
Additionally, it could be envisioned to include RPL in the normal
operation provided that a new Objective Function is defined that
Phinney, et al. Expires April 3, 2012 [Page 8]
Internet-Draft RPL-industrial-applicability-statement October 2011
actually interacts with the PCE is order to establish the reference
topology, in which case RPL operations would only apply to emergency
repair actions. when the reference topology becomes unusable for some
failure, and as long as the problem persists.
3.2. Applications and Traffic classes
The industrial market classifies process applications into three
broad categories and six classes.
o Safety
* Class 0: Emergency action - Always a critical function
o Control
* Class 1: Closed loop regulatory control - Often a critical
function
* Class 2: Closed loop supervisory control - Usually non-critical
function
* Class 3: Open loop control - Operator takes action and controls
the actuator (human in the loop)
o Monitoring
* Class 4: Alerting - Short-term operational effect (for example
event-based maintenance)
* Class 5: Logging and downloading / uploading - No immediate
operational consequence (e.g., history collection, sequence-of-
events, preventive maintenance)
Safety critical functions effect the basic safety integrity of the
plant. These normally dormant functions kick in only when process
control systems, or their operators, have failed. By design and by
regular interval inspection, they have a well-understood probability
of failure on demand in the range of typically once per 10-1000
years.
In-time deliveries of messages becomes more relevant as the class
number decreases.
Note that for a control application, the jitter is just as important
as latency and has a potential of destabilizing control algorithms.
The domain of applicability for the RPL protocol probably matches the
Phinney, et al. Expires April 3, 2012 [Page 9]
Internet-Draft RPL-industrial-applicability-statement October 2011
range of classes where industrial users are interested in deploying
wireless networks. This domain includes monitoring classes (4 and
5), and the non-critical portions of control classes (2 and 3). RPL
might also be considered as an additional repair mechanism in all
situations, and independently of the flow classification and the
medium type.
3.3. RPL applicability matrix
It appears from the above sections that whether and the way RPL can
be applied for a given flow depends both on the deployment scenario
and on the class of application / traffic. At a high level, this can
be summarized by the following matrix:
+---------------------+------------------------------------------------+
| Phase \ Class | 0 1 2 3 4 5 |
+=====================+================================================+
| Construction | X X X X |
+---------------------+------------------------------------------------+
| Planned startup | X X X X |
+---------------------+------------------------------------------------+
| Normal operation | ? ? ? |
+---------------------+------------------------------------------------+
| Planned shutdown | X X X X |
+---------------------+------------------------------------------------+
|Plant decommissioning| X X X X |
+---------------------+------------------------------------------------+
| Recovery and repair | X X X X X X |
+---------------------+------------------------------------------------+
? : typically usable for all but higher-rate classes 0,1 PS traffic
Figure 1: RPL applicability matrix
Phinney, et al. Expires April 3, 2012 [Page 10]
Internet-Draft RPL-industrial-applicability-statement October 2011
4. Characterization of communication flows in IACS wireless networks
4.1. General
In an IACS, high-rate communications flows (e.g., 1 Hz or 4 Hz for a
traditional process automation network) typically are such that only
a single wireless LLN hop separates the source device from a LLN
Border Router (LBR) to a significantly higher data-rate backbone
network, typically based on IEEE 802.3, IEEE 802.11, or IEEE 802.16,
as illustrated in Figure 2.
---+------------------------
| Plant Network
|
+-----+
| | Gateway
| |
+-----+
|
| Backbone
+--------------------+------------------+
| | |
+-----+ +-----+ +-----+
| | LLN border | | LLN border | | LLN border
o | | router | | router | | router
+-----+ +-----+ +-----+
o o o o
o o o o o o o o o o o
LLN
o : stationary wireless field device, seldom acting as an LLN router
Figure 2: High-rate low-delay low-variance IACS topology
For factory automation networks, the basic communications cycle for
control is typically much faster, on the order of 100 Hz or more. In
this case the LLN itself may be based on high-data-rate IEEE 802.11
or a 100 Mbit/s or faster optical link, and the higher-rate network
used by the LBRs to connect the LLN to superior automation equipment
typically might be based on fiber-optic IEEE 802.3, with multiple
LBRs around the periphery of the factory area, so that most high-rate
communications again requires only a single wireless LLN hop.
Multi-hop LLN routing is used within the LLN portion of such networks
to provide backup communications paths when primary single-hop LLN
paths fail, or for lower repetition rate communications where longer
LLN transit times and higher variance are not an issue. Typically,
Phinney, et al. Expires April 3, 2012 [Page 11]
Internet-Draft RPL-industrial-applicability-statement October 2011
the majority of devices in an IACS can tolerate such higher-delay
higher-variance paths, so routing choices often are driven by energy
considerations for the affected devices, rather than simply by IACS
performance requirements, as illustrated in Figure 3.
---+------------------------
| Plant Network
|
+-----+
| | Gateway
| |
+-----+
|
| Backbone
+--------------------+------------------+
| | |
+-----+ +-----+ +-----+
| | Backbone | | Backbone | | Backbone
| | router | | router | | router
+-----+ +-----+ +-----+
o o o o o o o o o o o o o
o o o o o o o o o o o o o o o o o o
o o o o o o o o o o o M o o o o o
o o M o o o o o o o o o o o o o
o o o o o o o o o
o o o o o
LLN
o : stationary wireless field device, often acting as an LLN router
M : mobile wireless device
Figure 3: Low-rate higher-delay higher-variance IACS topology
Two decades of experience with digital fieldbuses has shown that four
communications paradigms dominate in IACS:
SS: Source-sink
PS: Publish-subscribe
P2P: Peer-to-peer
P2MP: Peer-to-multipeer
Phinney, et al. Expires April 3, 2012 [Page 12]
Internet-Draft RPL-industrial-applicability-statement October 2011
4.2. Source-sink (SS) communication paradigm
In SS, the source-sink communication paradigm, each of many devices
in one set, S1, sends UDP-like messages, usually infrequently and
intermittently, to a second set of devices, S2, determined by a
common multicast address. A typical example would be that all
devices within a given process unit N are configured to send process
alarm messages to the multicast address
Receivers_of_process_alarms_for_unit_N. Receiving devices, typically
on non-LLN networks accessed via LBRs, are configured to receive such
multicast messages if their work assignment covers process unit N,
and not otherwise.
Timeliness of message delivery is a significant aspect of some SS
communication. When the SS traffic conveys process alarms or device
alerts, there is often a contractual requirement, and sometimes even
a regulatory requirement, on the maximum end-to-end transit delay of
the SS message, including both the LLN and non-LLN components of that
delay. However, there is no requirement on relative jitter in the
delivery of multiple SS messages from the same source, and message
reordering during transit is irrelevant.
Within the LLN, the SS paradigm simply requires that messages so
addressed be forwarded to the responsible LBR (or set of equivalent
LBRs) for further forwarding outside the LLN. Within the LLN such
traffic typically is device-to-LBR or device-to-redundant-set-of-
equivalent-LBRs. In general, SS traffic may be aggregated before
forwarding when both the multicast destination address and other QoS
attributes are identical. If information on the target delivery
times for SS messages is available to the aggregating forwarding
device, that device may intentionally delay forwarding somewhat to
facilitate further aggregation, which can significantly reduce LLN
alarm-reporting traffic during major plant upset events.
4.3. Publish-subscribe (PS, or pub/sub) communication paradigm
In PS, the publish-subscribe communication paradigm, a device sends
UDP-like messages, usually periodically or cyclicly (i.e.,
repetitively but without fixed periodicity), to a single multicast
address derived from or correlated with the device's own address. A
typical example would be that each sensor and actuator device within
a given process unit N is configured to send process state messages
to the multicast address that designates its specific publications.
In essence the derived multicast address for device D is
Receivers_of_publications_by_device_D. Typically those receivers are
in two categories: controllers (C) for control loops in which device
D participates, and devices accessed via the LLN's LBRs that monitor
and/or accumulate historical information about device D's status and
Phinney, et al. Expires April 3, 2012 [Page 13]
Internet-Draft RPL-industrial-applicability-statement October 2011
outputs.
If the controller(s) that receive device D's publication are all
outside the LLN and accessed by LBRs, then within the LLN such
traffic typically is device-to-LBR or device-to-redundant-set-of-
equivalent-LBRs. But if a controller (Cn) is within the LLN, then a
number of different LLN-local traffic patterns may be employed,
depending on the capabilities of the underlying link technology and
on configured performance requirements for such reporting. Typically
in such a case, publication by device D is forwarded up a DODAG to an
LLN router that is also on a downward DODAG to a destination
controller Cn, then forwarded down that second DODAG to that
destination controller Cn. Of course, if the LLN router (or even the
LBR) is itself the intended destination controller, which will often
be the case, then no downward forwarding occurs.
Timeliness of message delivery is a critical aspect of PS
communication. Individual messages can be lost without significant
impact on the controlled physical process, but typically a sequence
of four consecutive lost messages will trigger fallback behavior of
the control algorithms, which is considered a system failure by most
system owner/operators. (In general, and unless a local catastrophic
event such as a major explosion or a tornado occurs in the plant,
invocation of more than one instance of such fallback handling per
year, per plant, is considered unacceptable.)
Message loss, delay and jitter in delivery of PS messaging is a
relative matter. PS messaging is used for transfer of process
measurements and associated status from sensors to control
computation elements, from control computation elements to actuators,
and of current commanded position and status from actuators back to
control computation elements. The actual time interval of interest
is that which starts with sensing of the physical process (which
necessarily occurs before the sensed value can be sent in the first
message) and which ends when the computed control correction is
applied to the physical process by the appropriate actuator (which
cannot occur until after the second message containing the computed
control output has been received by that actuator). With rare
exception, the control algorithms used with PS messaging in the
process automation industries - those managing continuous material
flows - rely on fixed-period sampling, computation and transfer of
outputs, while those in the factory automation industries - those
managing discrete manufacturing operations - rely on bounded delay
between sampling of inputs, control computation and transfer of
outputs to physical actuators that affect the controlled process.
Deliberately manipulated message delay and jitter in delivery of PS
messaging has the potential to destabilize control loops. It is the
Phinney, et al. Expires April 3, 2012 [Page 14]
Internet-Draft RPL-industrial-applicability-statement October 2011
responsibility of conveyed higher-level protocols to protect against
such potential security attacks by detecting overly delayed or
jittered messages at delivery, converting them into instances of
message loss. Thus network and data-link protocols such as IPv6 and
Ethernet need not themselves address such issues, although their
selection and employment should take the existence (or lack) of such
higher-layer protection mechanisms, and the resulting consequences
due to excessive delay and jitter, into consideration in their
parameterization.
In general, PS traffic within the LLN is not aggregated before
forwarding, to minimize message loss and delay in reception by any
relevant controller(s) that are outside the LLN. However, if all
intended destination controllers are within the LLN, and at least one
of those intended controllers also serves as an LLN router on a DODAG
to off-LLN destinations that all are not controllers, then the router
functions in that device may aggregate PS traffic before forwarding
when the required routing and other QoS attributes are identical. If
information on the target delivery times for PS messages to non-
controller devices is available to the aggregating forwarding device,
that device may intentionally delay forwarding somewhat to facilitate
further aggregation.
In some system architectures, message streams that use PS to convey
current process measurements and status are compressed at the source
through a 2-dimensional winnowing process that compares
1) the process measurement values and status of the about-to-be-sent
message with that of the last actually-sent message, and
2) the current time vs. the queueing time for the last actually-sent
message.
If the interval since that last-sent message is less than a
predefined maximum time, and the status is unchanged, and the process
measurement(s) conveyed in the message is within predefined
deadband(s) of the last-sent measurement value(s), then transmission
of the new message is suppressed. Often this suppression takes the
form of not queuing the new message for transmission, but in some
protocols a brief placeholder message indicating "no significant
change" is queued in its stead.
4.4. Peer-to-peer (P2P) communication paradigm
In P2P, the peer-to-peer communication paradigm, a device sends UDP-
like or TCP-like messages from one device (D1) to a second device
(D2), usually with bidirectional but asymmetric flow of application
data, where the amount of data is significantly greater in one
Phinney, et al. Expires April 3, 2012 [Page 15]
Internet-Draft RPL-industrial-applicability-statement October 2011
direction than the other. Typical examples are transfer of
configuration information to or from a process field device, or
transfer of captured process diagnostics (e.g., time-stamped noise
signatures from a coriolis flowmeter) to an off-LLN higher-level
asset management system. Unicast addressing is used in both
directions of data flow.
In general, specific P2P traffic has only loose timeliness
requirements, typically just those required so that response times to
human-operator-initiated actions meet human factors requirements. As
a consequence, in general, message aggregation is permitted, although
few opportunities are likely to present themselves for such
aggregation due to the sporadic nature of such messaging to a single
destination, and/or due to the large message payloads that often
occur in at least one direction of transmission.
4.5. Peer-to-multipeer (P2MP) communication paradigm
In P2MP, the peer-to-multipeer communication paradigm, a device sends
UDP-like messages downward, from one device (D1) to a set of other
devices (Dn). Typical examples are bulk downloads to a set of
devices that use identical code image segments or identically-
structured database segments; group commands to enable device state
transitions that are quasi-synchronized across all or part of the
local network (e.g., switch to the next set of point-to-point
downloaded session keys, or notifying that the network is switching
to an emergency repair and recovery mode); etc. Multicast addressing
is used in the downward direction of data flow.
Devices can be assigned to a number of multicast groups, for instance
by device type. Then, if it becomes necessary to reflash all devices
of a given type with a new load image, a multicast distribution
mechanism can be leveraged to optimize the distribution operation.
In general, P2MP traffic has only loose timeliness requirements. As
a consequence, in general, message aggregation is permitted, although
few opportunities are likely to present themselves for such
aggregation due to the sporadic nature of such messaging to a single
multicast group destination, and/or due to the large message payloads
that often occur when P2MP is used for group downloads. However, in
general, message aggregation negatively impacts the delivery success
rate for each of the aggregated messages, since the probability of
error in a received message increases with message length> Together
these considerations often lead to a policy of non-aggregation for
P2MP messaging.
Note: Reliable group download protocols, such as the no-longer-
published IEEE 802.1E (ISO/IEC 15802-4) system load protocol, and
Phinney, et al. Expires April 3, 2012 [Page 16]
Internet-Draft RPL-industrial-applicability-statement October 2011
reliable multicast protocols based on the guidance of RFC2887, are
instructive in how P2MP can be used for initial bulk download,
followed by either P2MP or P2P selective retransmissions for missed
download segments.
4.6. Additional considerations: Duocast and N-cast
In industrial automation systems, some traffic is from (relatively)
high-rate monitoring and control loops, of Class 0 and Class 1 as
described in [RFC5673]. In such systems, the wireless link protocol,
which typically uses immediate in-band acknowledgement to confirm
delivery (or, on failure, conclude that a retransmission is
required), can be adapted to attempt simultaneous delivery to more
than one receiving device, with separated, sequenced immediate in-
band acknowledgement by each of those intended receivers. (This
mechanism is known colloquially as "duocast" (for two intended
receivers), or more generically as "N-cast" (for N intended
receivers).) Transmission is deemed successful if at least one such
immediate acknowledgement is received by the sending device;
otherwise the device queues the message for retransmission, up until
the maximum configured number of retries has been attempted.
The logic behind duocast/N-cast is very simple: In wireless systems
without FEC (forward error correction), the overall rate of success
for transactions consisting of an initial transmission and an
immediate acknowledgement is typically 95%. In other words, 5% of
such transactions fail, either because the initial message of the
transaction is not received correctly by the intended receiver, or
because the immediate acknowledgment by that receiver is not received
correctly by the transaction initiator.
In the generalized case of N-cast, where any received acknowledgement
serves to complete the transaction, and where the N intended
receivers are spatially diverse, physically separated from each other
by multiple wavelengths, the probability that all such receivers fail
to receive the initial message of the transaction, or that all
generated immediate acknowledgements are not received by the
transaction initiator, is typically approximately (5%)^N. Thus, for
duocast, the expected success rate for a single transaction goes from
95% (1.0 - 0.05) to 99.75% (1.0 - 0.05^2), to 99.9875% (1.0 - 0.05^3)
when N=3, and even higher when N>3.
From the above analysis, it is obvious that the primary benefit of
N-cast occurs when N goes from N=1 (unicast) to N=2 (duocast); the
reduction in transaction loss rate for increasing N>2 is quite small,
and for N>3 it is infinitesimal. In the typical industrial
automation environment of class 1 process control loops, which
typically repeat at a 1 Hz or 4 Hz rate, in a very large process
Phinney, et al. Expires April 3, 2012 [Page 17]
Internet-Draft RPL-industrial-applicability-statement October 2011
plant with thousands of field devices reporting at that rate, the
maximum number of transmission retries that must be planned, and for
which capacity must be scheduled (within the requisite 250 ms or 1 s
interval) is seven (7) retries for unicast PS reporting, but only
three (3) retries with duocast PS reporting. (This is determined by
the requirement to not miss four successive reports more than once
per year, across the entire plant, as such a loss typically triggers
fallback behavior in the controlled loop, which is considered a
failure of the wireless system by the plant owner/operator.) In
practice, the enormous reduction in both planned and used
retransmission capacity provided by duocast/N-cast is what enables
4 Hz loops to be supported in large wireless systems.
When available, duocast/N-cast typically is used only for one-hop PS
traffic on Class 1 and Class 0 control loops. It may also be
employed for rapid, reliable one-hop delivery of Class 0 and
sometimes Class 1 process alarms and device alerts, which use the SS
paradigm. Because it requires scheduling of multiple receivers that
are prepared to acknowledge the received message during the
transaction, in general it is not appropriate for the other types of
traffic in such systems - P2P and P2MP - and is not needed for other
classes of control loops or other types of traffic, which do not have
such stringent reporting requirements.
Note: Although there are known patent applications for duocast and
N-cast, at the time of this writing the patent assignee, Honeywell
International, has offered to permit cost-free RAND use in those
industrial wireless standards that have chosen to employee the
technology, under a reciprocal licensing requirement relative to that
use. Since duocast and N-cast provide performance and energy
optimizations, they are not essential for use in wireless systems.
However, in practice, their use makes it possible to support 4 Hz
wireless loops and meet sub-second safety alarm reporting
requirements in large plants, where that might otherwise be
impractical without use of a wired network. When duocast/N-cast is
not employed, the wireless retransmission capacity that is needed to
support such fast loops often is excessive, typically over 100x that
actually used for retransmission (i.e., providing for seven retries
per transaction when the mean number used is only 0.06 retries).
4.7. RPL applicability per communication paradigm
To match the requirements above, RPL provides a number of RPL Modes
of Operation (MOP):
Phinney, et al. Expires April 3, 2012 [Page 18]
Internet-Draft RPL-industrial-applicability-statement October 2011
No downward route: defined in [I-D.ietf-roll-rpl], section 6.3.1,
MOP of 0. This mode allows only upward routing, that is from
nodes (devices) that reside inside the RPL network toward the
outside via the DODAG root.
Non-storing mode: defined in [I-D.ietf-roll-rpl], section 6.3.1, MOP
of 1. This mode improves MOP 0 by adding the capability to use
source routing from the root towards registered targets within the
instance DODAG.
Storing mode without multicast support: defined in
[I-D.ietf-roll-rpl], section 6.3.1, MOP of 2. This mode improves
MOP 0 by adding the capability to use stateful routing from the
root towards registered targets within the instance DODAG.
Storing mode with link-scope multicast DAO: defined in
[I-D.ietf-roll-rpl] section 9.10, this mode improves MOP 2 by
adding the capability to send Destination Advertisements to all
nodes over a single Layer 2 link (e.g. a wireless hop) and enables
line-of-sight direct communication.
Storing mode with multicast support: defined in [I-D.ietf-roll-rpl],
Mode-of-operation (MOP) of 3. This mode improves MOP 2 by adding
the capability to register multicast groups and perform multicast
forwarding along the instance DODAG (or a spanning subtree within
the DODAG).
Reactive: defined in [I-D.ietf-roll-p2p-rpl], the reactive mode
creates on-demand additional DAGs that are used to reach a given
node acting as DODAG root within a certain number of hops. This
mode can typically be used for an ad-hoc closed-loop
communication.
The RPL MOP that can be applied for a given flow depends on the
communication paradigm. It must be noted that a DODAG that is used
for PS traffic can also be used for SS traffic since the MOP 2
extends the MOP 0, and that a DODAG that is used for P2MP
distribution can also be used for downward PS since the MOP 3 extends
the MOP 2.
On the other hand, an Objective Function (OF) that optimizes metrics
for a pure upwards DODAG might differ from the OF that optimizes a
mixed upward and downward DODAG.
As a result, it can be expected that different RPL instances are
installed with different OFs, different channel allocations, etc...
that result in different routing and forwarding topologies, sometimes
with differing delay vs. energy profiles, optimized separately for
Phinney, et al. Expires April 3, 2012 [Page 19]
Internet-Draft RPL-industrial-applicability-statement October 2011
the different flows at hand.
This can be broadly summarized in the following table:
+---------------------+------------+-----------------------------------+
| Paradigm\RPL MOP | RPL spec | Mode of operation |
+=====================+============+===================================+
| Peer-to-peer | RPL P2P | reactive (on-demand) |
+---------------------+------------+-----------------------------------+
| P2P line-of-sight | RPL base | 2 (storing) with multicast DAO |
+---------------------+------------+-----------------------------------+
| P2MP distribution | RPL base | 3 (storing with multicast) |
+---------------------+------------+-----------------------------------+
| Publish-subscribe | RPL base | 1 or 2 (storing or not-storing) |
+---------------------+------------+-----------------------------------+
| Source-sink | RPL base | 0 (no downward route) |
+---------------------+------------+-----------------------------------+
| N-cast publish | RPL base | 0 (no downward route) |
+---------------------+------------+-----------------------------------+
Figure 4: RPL applicability per communication paradigm
Phinney, et al. Expires April 3, 2012 [Page 20]
Internet-Draft RPL-industrial-applicability-statement October 2011
5. RPL profile
5.1. Use for process control
This section outlines a RPL profile for a representative deployment
in a process control application. Process monitoring without control
is typically less demanding, so a subset of this profile generally
will suffice.
5.2. RPL features
5.2.1. Storing vs. non-storing mode
RPL operation is defined for a single RPL instance. However,
multiple RPL instances can be supported in multi-service networks
where different applications may require the use of different routing
metrics and constraints, e.g., a network carrying both safety and
non-safety control and monitoring traffic.
In general, storing mode is required for high-reporting-rate devices
(where "high rate" is with respect to the underlying link data
conveyance capability). Such devices, in the absence of path
failure, are typically only one hop from the LBR(s) that convey their
messaging to other parts of the system. Fortunately, in such cases,
the routing tables required by such nodes are small, even when they
include information on DODAGs that are used as backup alternate
routes.
In general, devices which communicate with LBRs through a chain of
intermediary devices will use storing mode for their upward DODAGs,
but will use non-storing mode for downward DODAGs for messaging that
they route further into the LLN. However, routers that provide
downward forwarding for PS messaging addressed to controllers within
the LLN (which is expected to be a rare occurrence) will use storing
mode for those forwarding paths, so that timely, destination-
constrained forwarding of such recurring messaging does not overload
the routing node(s) and their downstream subnets.
5.2.2. DAO policy
Two-way communication is a requirement in industrial automation
systems. As a result, nodes SHOULD send DAO messages to establish
downward paths from the root to themselves.
<to be added>
Phinney, et al. Expires April 3, 2012 [Page 21]
Internet-Draft RPL-industrial-applicability-statement October 2011
5.2.3. Path metrics
RPL relies on an Objective Function for selecting parents and
computing path costs and rank. This objective function is decoupled
from the core RPL mechanisms and also from the metrics in use in the
network. Two objective functions for RPL have been defined at the
time of this writing, OF0 and MRHOF, both of which define the
selection of a preferred parent and backup parents, and are suitable
for industrial automation network deployments.
Neither of the currently defined objective functions supports
multiple metrics that might be required in heterogeneous industrial
automation networks (e.g., networks composed of devices with
different energy and timeliness-of-communication constraints).
Additional objective functions specifically designed for such
networks may be defined in companion RFCs.
5.2.4. Objective functions
<to be added>
5.2.5. DODAG repair
5.2.6. Security
Industrial automation network deployments typically operate in areas
that provide limited physical security (relative to the risk of
attack). For this reason, the link layer, transport layer and
application layer technologies utilized within such networks
typically provide security mechanisms to ensure authentication,
confidentiality, integrity, timeliness and freshness. As a result,
such deployments may not need to implement RPL's security mechanisms
and could rely on link layer and higher layer security features.
5.3. RPL options
5.4. Recommended configuration defaults and ranges
5.4.1. Trickle parameters
Trickle was designed to be density-aware and perform well in networks
characterized by a wide range of node densities. The combination of
DIO packet suppression and adaptive timers for sending updates allows
Trickle to perform well in both sparse and dense environments.
<to be added>
Phinney, et al. Expires April 3, 2012 [Page 22]
Internet-Draft RPL-industrial-applicability-statement October 2011
5.4.2. Other parameters
<to be added>
5.4.3. Additional configuration recommendations
<to be added>
Phinney, et al. Expires April 3, 2012 [Page 23]
Internet-Draft RPL-industrial-applicability-statement October 2011
6. Other related protocols
<to be added>
Phinney, et al. Expires April 3, 2012 [Page 24]
Internet-Draft RPL-industrial-applicability-statement October 2011
7. Manageability
Network manageability is a critical aspect of smart grid network
deployment and operation. With millions of devices participating in
the smart grid network, many requiring real-time reachability,
automatic configuration, and lightweight network health monitoring
and management are crucial for achieving network availability and
efficient operation.
RPL enables automatic and consistent configuration of RPL routers
through parameters specified by the DODAG root and disseminated
through DIO packets. The use of Trickle for scheduling DIO
transmissions ensures lightweight yet timely propagation of important
network and parameter updates and allows network operators to choose
the trade-off point they are comfortable with respect to overhead vs.
reliability and timeliness of network updates.
The metrics in use in the network along with the Trickle Timer
parameters used to control the frequency and redundancy of network
updates can be dynamically varied by the root during the lifetime of
the network. To that end, all DIO messages SHOULD contain a Metric
Container option for disseminating the metrics and metric values used
for DODAG setup. In addition, DIO messages SHOULD contain a DODAG
Configuration option for disseminating the Trickle Timer parameters
throughout the network.
The possibility of dynamically updating the metrics in use in the
network as well as the frequency of network updates allows deployment
characteristics (e.g., network density) to be discovered during
network bring-up and to be used to tailor network parameters once the
network is operational rather than having to rely on precise pre-
configuration. This also allows the network parameters and the
overall routing protocol behavior to evolve during the lifetime of
the network.
RPL specifies a number of variables and events that can be tracked
for purposes of network fault and performance monitoring of RPL
routers. Depending on the memory and processing capabilities of each
smart grid device, various subsets of these can be employed in the
field.
<to be added>
Phinney, et al. Expires April 3, 2012 [Page 25]
Internet-Draft RPL-industrial-applicability-statement October 2011
8. IANA considerations
This specification has no requirement on IANA.
Phinney, et al. Expires April 3, 2012 [Page 26]
Internet-Draft RPL-industrial-applicability-statement October 2011
9. Security considerations
This document does not specify operations that could introduce new
threats. Security considerations for RPL deployments are to be
developed in accordance with recommendations laid out in, for
example, [I-D.tsao-roll-security-framework].
Industrial automation networks are subject to stringent security
requirements as they are considered a critical infrastructure
component. At the same time, since they are composed of large
numbers of resource- constrained devices inter-connected with
limited-throughput links, many available security mechanisms are not
practical for use in such networks. As a result, the choice of
security mechanisms is highly dependent on the device and network
capabilities characterizing a particular deployment.
In contrast to other types of LLNs, in industrial automation networks
centralized administrative control and access to a permanent secure
infrastructure is available. As a result link-layer, transport-layer
and/or application-layer security mechanisms are typically in place
and may make use of RPL's secure mode unnecessary.
Phinney, et al. Expires April 3, 2012 [Page 27]
Internet-Draft RPL-industrial-applicability-statement October 2011
10. Acknowledgements
<to be added>
Phinney, et al. Expires April 3, 2012 [Page 28]
Internet-Draft RPL-industrial-applicability-statement October 2011
11. References
11.1. Normative References
[RFC2119] Bradner, S., "Key words for use in RFCs to Indicate
Requirement Levels", BCP 14, RFC 2119, March 1997.
11.2. Informative References
[I-D.ietf-roll-of0]
Thubert, P., "RPL Objective Function Zero",
draft-ietf-roll-of0-20 (work in progress), September 2011.
[I-D.ietf-roll-p2p-rpl]
Goyal, M., Baccelli, E., Philipp, M., Brandt, A., Cragie,
R., and J. Martocci, "Reactive Discovery of Point-to-Point
Routes in Low Power and Lossy Networks",
draft-ietf-roll-p2p-rpl-04 (work in progress), July 2011.
[I-D.ietf-roll-rpl]
Winter, T., Thubert, P., Brandt, A., Clausen, T., Hui, J.,
Kelsey, R., Levis, P., Pister, K., Struik, R., and J.
Vasseur, "RPL: IPv6 Routing Protocol for Low power and
Lossy Networks", draft-ietf-roll-rpl-19 (work in
progress), March 2011.
[I-D.ietf-roll-terminology]
Vasseur, J., "Terminology in Low power And Lossy
Networks", draft-ietf-roll-terminology-06 (work in
progress), September 2011.
[I-D.tsao-roll-security-framework]
Tsao, T., Alexander, R., Daza, V., and A. Lozano, "A
Security Framework for Routing over Low Power and Lossy
Networks", draft-tsao-roll-security-framework-02 (work in
progress), March 2010.
[RFC5548] Dohler, M., Watteyne, T., Winter, T., and D. Barthel,
"Routing Requirements for Urban Low-Power and Lossy
Networks", RFC 5548, May 2009.
[RFC5673] Pister, K., Thubert, P., Dwars, S., and T. Phinney,
"Industrial Routing Requirements in Low-Power and Lossy
Networks", RFC 5673, October 2009.
[RFC5826] Brandt, A., Buron, J., and G. Porcu, "Home Automation
Routing Requirements in Low-Power and Lossy Networks",
RFC 5826, April 2010.
Phinney, et al. Expires April 3, 2012 [Page 29]
Internet-Draft RPL-industrial-applicability-statement October 2011
[RFC5867] Martocci, J., De Mil, P., Riou, N., and W. Vermeylen,
"Building Automation Routing Requirements in Low-Power and
Lossy Networks", RFC 5867, June 2010.
11.3. External Informative References
[HART] www.hartcomm.org, "Highway Addressable Remote Transducer,
a group of specifications for industrial process and
control devices administered by the HART Foundation".
[ISA100.11a]
ISA, "ISA100, Wireless Systems for Automation", May 2008,
< http://www.isa.org/Community/
SP100WirelessSystemsforAutomation>.
Phinney, et al. Expires April 3, 2012 [Page 30]
Internet-Draft RPL-industrial-applicability-statement October 2011
Authors' Addresses
Tom Phinney (editor)
consultant
5012 W. Torrey Pines Circle
Glendale, AZ 85308-3221
USA
Phone: +1 602 938 3163
Email: tom.phinney@cox.net
Pascal Thubert
Cisco Systems
Village d'Entreprises Green Side
400, Avenue de Roumanille
Batiment T3
Biot - Sophia Antipolis 06410
FRANCE
Phone: +33 497 23 26 34
Email: pthubert@cisco.com
Robert Assimiti
Nivis
1000 Circle 75 Parkway SE, Ste 300
Atlanta, GA 30339
USA
Phone: +1 678 202 6859
Email: robert.assimiti@nivis.com