Network Working Group S. Farrell Internet-Draft Trinity College Dublin Intended status: Experimental December 14, 2012 Expires: June 17, 2013 A Fast-Track way to RFC with Running Code draft-farrell-ft-02 Abstract This memo proposes an optional fast-track way to get from a working group document to IESG review that can be used for cases when working group chairs believe that there is running code that implements a working group Internet-Draft. The basic idea is to do all of working group last call, IETF last call and area director review during the same two week period, to impose a higher barrier for comments that might block progress, and to require prompt action by authors in processing any changes arising from IETF last call. The motivation is to have the IETF process explicitly consider running code, consistent with the IETF's overall philosophy of running code and rough consensus. The intent is to run an RFC 3933 process experiment to test out this approach. [[This draft is proposed by the author and not the IESG.]] Status of this Memo This Internet-Draft is submitted in full conformance with the provisions of BCP 78 and BCP 79. Internet-Drafts are working documents of the Internet Engineering Task Force (IETF). Note that other groups may also distribute working documents as Internet-Drafts. The list of current Internet- Drafts is at http://datatracker.ietf.org/drafts/current/. Internet-Drafts are draft documents valid for a maximum of six months and may be updated, replaced, or obsoleted by other documents at any time. It is inappropriate to use Internet-Drafts as reference material or to cite them other than as "work in progress." This Internet-Draft will expire on June 17, 2013. Copyright Notice Copyright (c) 2012 IETF Trust and the persons identified as the document authors. All rights reserved. This document is subject to BCP 78 and the IETF Trust's Legal Farrell Expires June 17, 2013 [Page 1] Internet-Draft Running Code Fast Track December 2012 Provisions Relating to IETF Documents (http://trustee.ietf.org/license-info) in effect on the date of publication of this document. Please review these documents carefully, as they describe your rights and restrictions with respect to this document. Table of Contents 1. Introduction . . . . . . . . . . . . . . . . . . . . . . . . . 3 2. Running Code . . . . . . . . . . . . . . . . . . . . . . . . . 3 3. Fast-Track Processing . . . . . . . . . . . . . . . . . . . . 4 4. Fast-Track Rules . . . . . . . . . . . . . . . . . . . . . . . 5 5. Relation to Current Processes . . . . . . . . . . . . . . . . 7 6. IANA Considerations . . . . . . . . . . . . . . . . . . . . . 8 7. Security Considerations . . . . . . . . . . . . . . . . . . . 8 8. Acknowledgements . . . . . . . . . . . . . . . . . . . . . . . 8 9. Changes . . . . . . . . . . . . . . . . . . . . . . . . . . . 9 9.1. -01 to -02 . . . . . . . . . . . . . . . . . . . . . . . . 9 9.2. -00 to -01 . . . . . . . . . . . . . . . . . . . . . . . . 9 10. References . . . . . . . . . . . . . . . . . . . . . . . . . . 10 10.1. Normative References . . . . . . . . . . . . . . . . . . . 10 10.2. Informative References . . . . . . . . . . . . . . . . . . 10 Author's Address . . . . . . . . . . . . . . . . . . . . . . . . . 10 Farrell Expires June 17, 2013 [Page 2] Internet-Draft Running Code Fast Track December 2012 1. Introduction [[Comments and things to change in obvious ways are in double-square brackets like this.]] This draft proposes an [RFC3933] experiment to try help speed up the latter stages of some working group document and to improve quality indirectly thanks to the existence of running code. The idea here is not to save the universe, nor to boil any oceans. IETF working groups are still liable to sometimes take years to get to the point where this "fastrack" might apply. So the overall saving in time may be modest. This experiment will run for one year from the date of issue of this RFC. We have established a wiki page at [[URL]] where experiences with this experiment can be recorded as the experiment runs. The goal of that is to help with the evaluation of the experiment as it runs and at the end. If the fast-track process is not used, then the experiment has also produced a result, and the wiki page will be fairly boring. 2. Running Code Implementations developed during the production of an Internet-draft can indicate that a working group has had the opportunity to get early confirmation of its engineering choices. This memo proposes an optional way to parallel process some final stage reviews when the working group management and area directors believe that the implementation can itself serve as a practical review of the engineering choices. Note that the existence of an open-source or other implementation is not by itself sufficient to ensure that the draft will pass IETF last-call or IESG review. All other criteria for Proposed Standard or Experimental need to be met as usual. Note also that this experiment just needs an implementation that makes it possible for the WG chairs and responsible AD to verify (to the extent they choose) that the implementation matches the draft. There is no implication at all about the licensing related to an open- or closed-source implementation. At one end of a spectrum it could be GPLv3, at another end, it could be code that's only made available on request. This can ideally and perhaps most easily be achieved by publishing the code source under a license that permits Farrell Expires June 17, 2013 [Page 3] Internet-Draft Running Code Fast Track December 2012 the public at large to read, compile and run it, e.g. under a Free Software or Open Source license. In all cases the WG chairs and AD do need to be able to say why they consider the implementation is appropriate for fast-track processing. Fast-track processing will not be suitable for all drafts. For example, a framework draft where an implementation won't by itself interoperate is probably not a good candidate. In contrast, a "-bis" RFC that aims for Proposed Standard or Experimental is likely to be a fine candidate. Sometimes, protocol proposals come from prototype implementations. At other times, as protocols are developed implementations are developed alongside the documents. In both of these situations, the feedback between the implementation experience -- the running code -- and the protocol development benefits both the protocol and the implementations. Protocol developers that have implementations to work with often do interoperability testing during the development process. Such testing can involve anything from small-scale, one-on-one testing to interoperability events, in person or online. These uncover bugs in implementations, but also often uncover errors, omissions, and lack of clarity in the protocols and their specifications. While this proposal does not require that efforts be that ambitious, this is the spirit behind it: that early implementations and ongoing development and testing throughout the protocol work can significantly improve the quality of a protocol and of its specification. 3. Fast-Track Processing The basic idea is that Working Group (WG) chairs can choose to progress a WG draft on the "fast-track" in some circumstances. When a document is being progressed on the fast-track, the following changes from [BCP9] and current IETF practices apply, and define the new "fast-track last call" state: 1. Any Working Group Last Call (WGLC) or Area Director (AD) review (which are routinely done, though not part of the formal [BCP9] process) will run in parallel with the two-week IETF Last Call (IETF-LC) period. 2. Only comments that would be "DISCUSS-worthy" according to the IESG Discuss Criteria [DCRIT] need be handled during last call. Farrell Expires June 17, 2013 [Page 4] Internet-Draft Running Code Fast Track December 2012 Other comments can be handled or not, at the authors/editors discretion. 3. Authors need to make any changes required within two weeks of the end of IETF-LC. If not, then the document is returned to the WG. 4. The document must either be returned to the WG, or else enter IESG review within two weeks of the end of fast-track last-call. The responsible AD for the WG concerned makes the decision as to whether changes are required and whether or not those have been completed. If significant change or extended discussion is required or changes are not complete within two weeks after the end of fast-track last call, then the draft should be returned to the WG by the responsible AD. If the responsbile AD does not act at the end of this two week period, then the IESG Secretary should ensure that the draft enters IESG evaluation and is scheduled for the next relevant telechat. 5. As soon as the responsible AD has confirmed that the authors/ editors have made any changes required as a result of fast-track last-call, then the document should enter IESG review and be placed on the next IESG telechat agenda that is more than one week in the future. Again, this should happen within two weeks of the end of fast-track last-call in the case where the document is not returned to the WG. 6. Given the fast-track processing, the responsible AD is not expected to (but of course can) ballot "Yes" for the document. Draft progression during and after IESG review is otherwise unaffected, so a "Yes" ballot is needed from some AD. 7. The IETF last call announcement message should say that the draft in question is following the fast-track process and refer to this RFC. 8. The draft itself should note (e.g. in the introduction) that it has been fast-track processed and reference this RFC. 4. Fast-Track Rules Some rules associated with this new fast-track are as follows: 1. Only a WG chair can choose to propose a draft from her WG that is aimed for Proposed Standard or Experimental for fast-track processing. Farrell Expires June 17, 2013 [Page 5] Internet-Draft Running Code Fast Track December 2012 2. Where there are two or more WG chairs, all need to agree to fast-track processing. 3. The WG and responsible AD ought not be surprised by the chairs' choice to use the fast-track process, ideally the WG and responsible AD ought to be aware that this is the plan from early in the development of the draft concerned. 4. The fast-track process only applies to IETF WG documents that are intended to become Proposed Standard or Experimental RFCs. The fast-track process can be used for "bis" RFCs and might well be quite suitable for those. 5. Working Group Last Call is often used as a tool for the chairs to ascertain that there is rough consensus in the working group for what's in the draft. For a fast-tracked document, the chairs need to be equally confident about rough consensus. 6. An implementation of the draft (ideally open-source) is required for fast-track last-call. If there is no implementation or if the implementation is unavailable or does not implement the draft sufficiently closely then the document needs to be returned to the WG. This only requires one implementation, not two, and the WG chairs and responsible AD decide themselves how much validation is required for this. 7. An AD can choose to accept the word of a WG chair that the implementation is available and sufficiently accurate, or an AD might choose to confirm this herself or via a third-party. 8. A document can only be proposed on the fast-track once. That is, if the document comes back to the WG after having been proposed on the fast-track, then fast-track processing cannot be proposed again if that draft is to be progressed subsequently. 9. If an IPR declaration happens at any time after a draft has started fast-track processing, including after IESG processing, then the draft is returned to the WG in all cases and has used up its "go" at fast-track processing. This does represent a potential denial of service attack on the draft authors, but it is public and can happen already in any case. 10. WG chairs ought to provide sufficient notice to the responsible AD that they will be using the fast-track last-call process and should ensure that the AD has sufficient time to carry out a review of the draft during fast-track last call. However, if the responsible AD is not responsive, the the WG chairs should go ahead and start the process. Farrell Expires June 17, 2013 [Page 6] Internet-Draft Running Code Fast Track December 2012 11. WG chairs initiate the process by sending a mail to the IESG- secretariat with the usual "Publication Requested" materials, but also highlighting that the fast-track last-call process is being triggered. That mail also ought also contain a pointer to the relevant implementatation. The responsible AD should also be copied on this message. 12. The timers associated with fast-track processing do increase the burden on cross-area review teams. At present such reviews are supposed to be done during IETF LC, but some useful reviews are not received until after the end of IETF LC. As is currently the case, the responsible AD and IESG will have to deal with such reviews as they are received. In addition, WG chairs can in any case ask for early review if desired. A part of the experiment here will be to see if fast-track processing significantly impacts on these reviews. 13. This one is not a "rule" but where a WG chair indicates in advance (e.g. in WG milestone text) that a work item is planned for fast-track processing, then the IESG and IAOC ought to try to accomodate requests for space and other logistics to support this at IETF meetings. Of course, what is possible will depend on the venue and on resources available and required, but the goal of the IETF ought be to try to help the WG to get the document to the point where fast-track processing can be done, which implies helping the WG with efforts to develop such an implementation (ideally open-source) if that is how the WG have chosen to proceed. 14. Another "non-rule": If the timers (IETF LC or the two-weeks after IETF LC for fixing things) co-incide with a major holiday period or IETF meeting then the responsible AD can add a week or two as appropriate. As this is an experiment we may learn more about good timer values as the experiment is run. WG chairs should be accomodating where such timer extensions are chosen by the responsible AD. 5. Relation to Current Processes The main effect of this experiment on the formal process is to add some timers and default actions, to encourage particular choices and to provide a new lever that WG chairs can pull in appropriate circumstances. Mostly, the mechanics are not actually process changes, and are already available options: Farrell Expires June 17, 2013 [Page 7] Internet-Draft Running Code Fast Track December 2012 o There is no process requirement for Working Group Last Call. Whether and when a working group document is ready for publication to be requested is up to the judgment of the working group chairs, based on discussion and rough consensus. o The responsible Area Director can decide how much, if any, document review to do before requesting Last Call. An AD who wishes to do her review in parallel with Last Call is always free to make that choice. o There is no requirement that the responsible AD ballot "Yes", though that is current practice. "The document is being fast- tracked," serves as a clear and acceptable explanation in the case where the responsible AD chooses not to ballot "Yes" at the start of IESG evaluation. o While this experiment seeks to improve outcomes by encouraging implementation before a draft becomes an RFC, there is of course no requirement for an implementation to exist for a draft to become a Proposed Standard or Experimental track RFC and this experiment is explicitly not intended to move the IETF process towards such a requirement. This is intended to be and remain an optional part of the IETF process, even if the experiment is successful. o This memo itself has no impact on appeal processes. However, in considering an appeal that relates to a document that has been fast-track processed, the relevant judge (WG chair, AD, IESG or IAB as appropriate) should consider the requirements posited here. 6. IANA Considerations [[To be removed, there aren't any.]] 7. Security Considerations Since this is proposed by a security AD something is clearly needed here. A WG chair and author could collude to launch an attack on the WG's AD by proposing a draft with code containing a trojan. Not much fun or profit for anyone there though:-) 8. Acknowledgements Thanks to the following folks who provided comments: Brian Carpenter, Elwyn Davies, Martin Duerst, Ted Hardie, Barry Leiba, Marc Petit- Farrell Expires June 17, 2013 [Page 8] Internet-Draft Running Code Fast Track December 2012 Huguenin, Hector Santos, Sean Turner, S. Moonesamy, All silliness, in this draft anyway, of course remains the sole responsibility of the author. [[If I left someone out who'd like to be there, please let me know.]] 9. Changes [[RFC editor: please remove this section before publication.]] 9.1. -01 to -02 o Fast-track draft can be aiming for experimental as well as PS. o Added text about marking LC and RFC o Added text about a wiki for the experiment. o Did an editorial pass over the lot and added clarifying text suggested by various folks 9.2. -00 to -01 o Changed target to experimental RFC. o Added 1 year experimental period. o Clarified that this is just for WG's and only the "responsible AD" is discussed. o Clarified that this is just for WGs and PS RFCs, but including -bis RFCs. o Added a rule about late IPR declarations. o Added a 2-week timer for authors to make changes after last-call, and other changes to try emphasise that speed is important here based on offlist comments that there wasn't a significant real difference in what might happen during/after last-call compared to now. o Noted cross-area review issue. o Added a section about relation to existing process(es). Farrell Expires June 17, 2013 [Page 9] Internet-Draft Running Code Fast Track December 2012 o Various other on and off list comments handled. 10. References 10.1. Normative References [BCP9] Bradner, S., "The Internet Standards Process -- Revision 3", BCP 9, RFC 2026, RFC 6410, October 1996. [DCRIT] IESG, "Discuss Criteria in IESG Review", July 2007, . 10.2. Informative References [RFC3933] Klensin, J. and S. Dawkins, "A Model for IETF Process Experiments", BCP 93, RFC 3933, November 2004. Author's Address Stephen Farrell Trinity College Dublin Dublin, 2 Ireland Phone: +353-1-896-2354 Email: stephen.farrell@cs.tcd.ie Farrell Expires June 17, 2013 [Page 10]